Works on metro line 3 and the Toots Thielemans station

The realization of metro line 3 involves major works: adapting the existing part of the line, drilling a tunnel (between Bordet and the Brussels-North station) and the construction of a depot (in Haren) and 8 new stations (including the Toots Thielemans station that will replace Lemonnier).

With metro line 3, a new axis with 18 stations will cover 10.3 km and cross the city from north to south. More info about the yard:

Several tram lines will connect to the future metro line 3 at the Toots Thielemans station. More info about this new station and the works:

Created on 09/03/2020 (modified on 08/11/2023)

AGENDA

    not found
 

SEE ALSO

Works on metro line 3 and the Toots Thielemans station
© metro3.be