Works at the Rue Calvin and Rue de l'Inquisition
The works at the Rue Calvin and the Rue de l'Inquisition will start on Monday 22 April 2024 (duration: 10 weeks).
- Restoring the pavements to their original state
- Installation of tree boxes
- Making the crossroads between Rue de l'Inquisition and Rue du Pavie, and between Rue de l'Inquisition and Rue Calvin, safer by widening the kerbs and installing street furniture.
- Rue Calvin will be made a one-way street between Chaussée de Louvain and Rue de l'Inquisition
- Refreshing the existing pedestrian crossings
Construction plan (PDF, 1.28 MB)
- Phase 1 - Rue de l'Inquisition (PDF, 904.21 KB): duration of works: 4 to 5 weeks
- Phase 2 - Rue Calvin (PDF, 900.36 KB): duration of works: 4 to 5 weeks
- TDV-chantiers@brucity.be
- Tel: 02 279 60 03
- Flyer sent to local residents in the Rue de l'Inquisition and Rue Calvin (PDF, 764.86 KB) (in French and Dutch)